The grid decides which compute gets built, and when.

Generation without delivery is not capacity. Nuclir resolves queues, congestion, headroom and curtailment against the load actually contracted against them.

Power is no longer the cheap part of a build.

For two decades a large industrial load could assume power. That assumption ended when AI compute began contracting for gigawatts on a schedule the transmission system was never planned around, and the interconnection queue turned from a formality into the single longest item on a build plan.

The consequence is that a megawatt is now a location and a date, not a quantity. Headroom at one substation is worthless to a campus twenty miles away on a congested corridor, and curtailment means nameplate generation and delivered energy are two different numbers that public reporting often blends.

Supply, delivery and demand as one model.

Nuclir holds generation, transmission constraint, queue position and contracted load as connected entities rather than as separate market feeds. That is what makes it possible to ask which sites hold deliverable power today, and which are holding a queue position that has already slipped twice.

Because the model also carries the equipment a connection depends on - transformers, switchgear, substation work - a power date and a supply-chain date stop being maintained by two teams who reconcile once a quarter.

Four things that decide deliverable power.

Each is resolved onto a location and a date, because a megawatt without both is a number that cannot be planned against.

Interconnection queues

Positions, study stages, withdrawals and re-scopes, tied to the load waiting behind each one.

Congestion and headroom

Where the transmission system can actually deliver, and where nameplate capacity is stranded behind it.

Firm capacity

What can be relied on at peak, separated from what is installed - the distinction a compute contract lives on.

Curtailment

Energy generated and not delivered, which is the gap between an installed fleet and a useful one.

Queues, weather, and the load that showed up early.

Queue positions are revised, projects withdraw, and interconnection studies re-scope. Each of those is a filing, and each of them changes the deliverable capacity behind some specific load. Read as documents they are noise; resolved against the sites that depend on them they are a schedule change.

Weather is the other half of the same picture. Heat drives load and derates transmission at the same moment, and hydrology decides what a dispatchable fleet can actually run - which is why grid and climate are one model here rather than two subscriptions.

Evidence that keeps pace with the decision.